Marine

J.E. McAmis maintains a modern fleet of ABS classed dredging equipment, barges, tugboats and support vessels.  

Projects

Date: 2012

J.E. McAmis removed cobbles and boulders from within nine different downstream bays of the Bonneville Dam Spillway Stilling Basin. This work was performed utilizing a rotating hydraulic...

Date: 2012

Constructed a new pre-cast concrete panel oyster dock on steel piling.

Date: 2010

Three million cubic yards of blasting, excavation/dredging in 12 months. Construction of upland containment facility which included roadways and bridges, maintenance of traffic for public use, dewatering of roadways...

Date: 2009

Work entailed raising approximately 450 linear feet of the existing North Jetty to El. +8.0 feet MLLW. Construction included the manufacture and installation of marine mattresses, placement...

Date: 2009

Work entailed raising approximately 450 linear feet of the existing North Jetty to El. +8.0 feet MLLW. Construction included the manufacture and installation of marine mattresses, placement...