Pile Driving

.

Projects

Date: 2012

Constructed a new pre-cast concrete panel oyster dock on steel piling.

Date: 2009

Work entailed raising approximately 450 linear feet of the existing North Jetty to El. +8.0 feet MLLW. Construction included the manufacture and installation of marine mattresses, placement...

Date: 2009

The Interim Corner Cut-off project was performed for the Canaveral Port Authority by J.E. McAmis, and consisted of approximately 225,000 cubic yards of upland excavation and another 300,000...

Date: 2007

The Herbert Hoover Dike Project was the first phase of a series of pilot projects for the U.S. Army Corps of Engineers, undertaken to stabilize the dike surrounding Lake Okeechobee. The...

Date: 2006

The North Jetty Sand Tightening and Extension Project at Cape Canaveral, FL, consisted of reconstruction of the existing North Jetty and extending the jetty an additional 300’. The project...