The NJCR Project consisted of performing critical repairs to some 1,500 LF of the MCR North Jetty, including 200 LF of reconstruction of the North Jetty head. The NJCR Project requires reworking of existing relict stone, proper seating of toe stone, reaches requiring a crane, interlock and slope building requiring an excavator, jetty road construction and single season procurement and placement of more than 52,000 tons of jetty stone ranging in size from 7 to 28.5 tons each.
