Port Canaveral Interim Corner Cutoff Project

The Interim Corner Cut-off project was performed for the Canaveral Port Authority by J.E. McAmis, and consisted of approximately 225,000 cubic yards of upland excavation and another 300,000 cubic yards of dredging. The upland material was utilized to construct an embankment and spoil dike system. The system included a spillway, weir structure, drainage outfalls and slope protection. The entire upland site was protected from erosion through the use of silt fence, turbidity barrier, hydroseeding and sod. The dredged material was disposed of off shore in the Canaveral Ocean Dredged Material Disposal Site. The project included sheet pile wall demolition, sheet pile wall modifications and installation of approximately 12,000 square feet of sheet pile along a portion of the new bank alignment. The project also included placement of rip-rap slope protection, and the construction of several concrete outfall structures.

Back to Project Category

Our Affiliates

J.E. McAmis work with these Amazing Partners

Our Affiliates Logo
Our Affiliates Logo
Our Affiliates Logo
Our Affiliates Logo
Our Affiliates Logo

Outstanding safety, environmental, on-time performance, and partnering records have helped J.E. McAmis maintain positive long-term relationships with our clients, subcontractors, permitting agencies, and the community

With over 40 years of Federal project experience throughout the United States, J.E. McAmis has taken on a wide variety of unique and highly specialized heavy civil projects. J.E. McAmis has performed major excavation projects, constructed material containment facilities, jettys, breakwaters, canals, drainage structures, bridges, wharves, docks, weir structures and levees; installed slurry/cutoff walls and relief trenches.